ARP Type | MARS-500 | MARS-750 | MARS-1000 | MARS-1500 | MARS-2000 | MARS-2500 | ||||
Design Parameters
| ||||||||||
Waste acid | L/h | 500 | 750 | 1000 | 1500 | 2000 | 2500 | |||
Fe2+ | g/L | 120 | 120 | 120 | 120 | 120 | 120 | |||
Total HCl | g/L | 200 | 200 | 200 | 200 | 200 | 200 | |||
Free HCl | g/L | 40 | 40 | 40 | 40 | 40 | 40 | |||
Rinse Water | L/h | 540 | 875 | 1200 | 1850 | 2400 | 3000 | |||
Utility Consumption
| ||||||||||
Natural Gas | NM ³/ h | 52 +/- 10% | 78 +/- 10% | 104 +/- 10% | 156 +/- 10% | 212 +/- 10% | 260 +/- 10% | |||
Caloric Heat Value | MJ/NM ³ | 36 | 36 | 36 | 36 | 36 | 36 | |||
Industrial Water | L/h | 150 | 225 | 300 | 450 | 600 | 750 | |||
Instrument Air | NM ³/ h | 10 | 10 | 10 | 10 | 10 | 10 | |||
Electrical Power | kW | 27 +/- 10% | 41 +/- 10% | 54 +/- 10% | 81 +/- 10% | 105 +/- 10% | 135 +/- 10% | |||
Products
| ||||||||||
Regenerated Acid | L/h | 560 | 818 | 1130 | 1700 | 2260 | 2825 | |||
Total HCl | % w/w | 18 | 18 | 18 | 18 | 18 | 18 | |||
Iron Oxide | kg/h | 86 | 129 | 172 | 258 | 344 | 430 | |||
Emission
| ||||||||||
Fumes | NM ³/ h | 1330 | 1990 | 2660 | 3980 | 5320 | 6650 | |||
Particles | Mg/NM ³ | <10 | <10 | <10 | <10 | <10 | <10 | |||
HCl | Mg/NM ³ | <10 | <10 | <10 | <10 | <10 | <10 | |||
Short supply time: | Short Delivery Time due to standard components: 8 Months |
Fast installation and debugging: | Modular ARPs in container size, pre-commissioned :Erection time approx. 2 weeks |
Applicable in a wide range of places: | Outdoor Installation or inside a building is possible |
High reliability: | Reactor and Burner Technology from Germany |
Additional gain: | Provide additional iron oxide buyback service to ensure that customers have no worries about operation and maintenance |
Low maintenance costs: | The system is integrated into the pickling line without additional labor cost |
Innovative technologies: | Oxide size control;Fully automated operation;Quick Start and Stop Technology |